Design, supply and construction of a 1,000 m³ desalination and treatment plant at Al-Seeba, then its operation and maintenance for five years.

Al-Sagban Group undertook the design, supply, construction, and implementation of a water desalination and treatment plant in Al-Siba District, with a production capacity of 1,000 cubic meters per day, in accordance with the required engineering specifications and technical standards. The project scope includes all stages of implementation, starting with engineering design and technical studies, followed by the supply of specialized equipment and systems, civil, mechanical, and electrical works, installation, commissioning, and performance testing to ensure the plant's operational efficiency. Furthermore, the project includes the operation and maintenance of the plant for a period of five years, ensuring operational continuity, system reliability, and sustained performance in accordance with the required technical standards.