Basra International Airport and the Shalamcheh crossing: design, construction and rehabilitation of buildings, runway, gates and security systems.

Three group companies work on the airport and the crossings: Al Sagban delivered phase two of the Shalamcheh border crossing and the fire detection system and inner and outer security fence of Basra International Airport; Al-Hillal has worked on the airport development programme since 2022 under successive contracts for the terminal, runway, gate and inspection building, and built phase one of Shalamcheh; and Signature designed the airport's main gate, inspection facility and passenger hall.
Terminal, VIP hall, administration and fire buildings, from Signature's drawings to Al-Hillal's construction.
The fire detection and suppression system and the airport's security fence rehabilitation, by Al Sagban.
Shalamcheh in two phases: the first by Al-Hillal, the second by Al Sagban.
Send the scope of work; we match it to the right company in the group and come back with a technical and commercial offer.